Instructions: Tuscany CreativeRail
Before installation check with your office of the local building inspector. Local building codes and by-laws may apply to outdoor railings. The vertical height from the deck to the top of the railing as well as minimum spacing between balusters is frequently stipulated.

|
Step 1
Set newel posts to accommodate pre-drilled railing length. |

|
Step 2
Center pre-drilled rail between newel posts and trim equal amounts from each end of top and bottom rails. Trim Lock-Bar from one end.
|

|
Step 3
Lay balusters on ground and thread Lock-Bar through. |
 
|
Step 4
Attach longer leg of bracket to underside of rail ends. Ensure that the brackets are centered on the rails. |

|
Step 5
Use a high quality polyurethane construction adhesive (caulking) . Fill holes to approximately half full. This will bond the baluster to the wood railing and prevent water from leaking into the railing gaps. |

|
Step 6
Insert balusters into pre-drilled holes in railing. |

|
Step 7
Use a 2x4 block or spacer beneath bottom rail to set desired height from patio floor. Attach assembled units to post . |

|
Step 8
Apply optional cap rail. |
Purchase this railing kit
|